ST 3 RAMP XX over HWY CENTRE ST

QUINCY ADAMS STATION · County 021, Massachusetts · Built 2009 · 2 Lanes · 27,770 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
Q010519PNDOTNBI
Year Built
2009
Length
245 m (803.8 ft)
Max Span
44.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
27,770
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$25,240,000
Total Project Cost
$37,861,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.