I 93 SB CONNECTOR over I 93 NB

I 93 SB AT I 93 NB · County 021, Massachusetts · Built 1957 · 3 Lanes · 68,793 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B21029357DOTNBI
Year Built
1957
Reconstructed
1982
Length
22 m (72.2 ft)
Max Span
20.4 m
Width
14.4 m (47.2 ft)
Lanes
3
Daily Traffic
68,793
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,792,000
Total Project Cost
$2,689,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.