HWY RMP J (WASH) over ST 3 SB CONNECTOR

ST 3 SB · County 021, Massachusetts · Built 1981 · 2 Lanes · 4,135 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B2105834TDOTNBI
Year Built
1981
Length
47.8 m (156.8 ft)
Max Span
45.7 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
4,135
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,291,000
Total Project Cost
$4,937,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.