I 93 RAMP SACN over TR ORANGE LINE

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2005 · 2 Lanes · 19,624 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B166038DEDOTNBI
Year Built
2005
Length
167.2 m (548.6 ft)
Max Span
43.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
19,624
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,403,000
Total Project Cost
$5,105,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.