I 93 NB over I 93 SB/AUSTN ST/MBTA

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2002 · 5 Lanes · 36,462 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B166008YYDOTNBI
Year Built
2002
Length
162.3 m (532.5 ft)
Max Span
45.1 m
Width
21.8 m (71.5 ft)
Lanes
5
Daily Traffic
36,462
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,207,000
Total Project Cost
$19,811,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.