I 93 RAMPS NS SN over OTHER RELIEF

I93 RAMPS N-S S-N · County 025, Massachusetts · Built 1999 · 2 Lanes · 20,161 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B165769ELDOTNBI
Year Built
1999
Length
64.4 m (211.3 ft)
Max Span
3.7 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
20,161
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,326,000
Total Project Cost
$1,990,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.