US 1 RAMP TC over RR MBTA

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2002 · 2 Lanes · 51,207 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1639282FDOTNBI
Year Built
2002
Length
118 m (387.1 ft)
Max Span
46.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
51,207
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,071,000
Total Project Cost
$3,107,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.