I 93 SB over COMB MILLERS RIVER/ OTH

I93/US 1 INTERCHANGE · County 025, Massachusetts · Built 2002 · 3 Lanes · 80,170 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B166018YWDOTNBI
Year Built
2002
Length
254.2 m (834 ft)
Max Span
44.8 m
Width
20.1 m (65.9 ft)
Lanes
3
Daily Traffic
80,170
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$33,275,000
Total Project Cost
$49,913,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.