I 93 RAMP NS over OTHER RELIEF
I93 RAMP NS · County 025, Massachusetts · Built 1999 · 1 Lanes · 31,810 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.372089, -71.067744
This bridge is in worse condition than 24.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 27 years old.
Nearby Bridges
I 93 NB over I 93 SB
Built 2003
I 93 RAMP NS over US 1 RAMP TC
Built 1999
US 1 RAMP TC over I 93 RMPS SN NS ST
Built 2002
I 93 RAMP SN over US 1 RAMP TC
Built 1999
I 93 SB over COMB MILLERS RIVER/ OTH
Built 2002
US 1 RAMP S-TB over COMB RMP NS CT TL&MBTA
Built 2001
I 93 RAMP SN over US 1 RAMP CT
Built 1999
I 93 RAMP TS over US 1 RAMP LC
Built 2002
US 1 RAMP TC over RR MBTA
Built 2002
US 1 RAMP CT over COMB I93 SB &RMPS& MBTA
Built 2001
Bridge Details
- Structure #
- B165748YQDOTNBI
- Year Built
- 1999
- Length
- 12.5 m (41 ft)
- Max Span
- 4 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 1
- Daily Traffic
- 31,810
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $244,000
- Total Project Cost
- $367,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.