I 93 NB over I 93 SB

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 2003 · 3 Lanes · 70,395 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B16600900DOTNBI
Year Built
2003
Length
166.7 m (546.9 ft)
Max Span
43.6 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
70,395
Material
Prestressed Concrete Continuous
Design
Segmental Box Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,889,000
Total Project Cost
$26,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.