I 93 SB BT 33-38 over TR ORANGE LINE

.6 MI N OF JCT I93&US1 · County 025, Massachusetts · Built 1970 · 3 Lanes · 85,975 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B162813EADOTNBI
Year Built
1970
Length
124 m (406.8 ft)
Max Span
25 m
Width
21 m (68.9 ft)
Lanes
3
Daily Traffic
85,975
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,042,000
Total Project Cost
$25,564,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.