I 93 RAMPS SN NS over RR BMRR BSG SPUR

I93/US1 INTERCHANGE · County 025, Massachusetts · Built 1999 · 2 Lanes · 37,301 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B166059UADOTNBI
Year Built
1999
Length
260 m (853 ft)
Max Span
44.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
37,301
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,152,000
Total Project Cost
$7,729,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.