HWY HERALD ST over RR CSX SPUR

AT INK BLOCK · County 025, Massachusetts · Built 1957 · 3 Lanes · 25,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B1627538QMUNNBI
Year Built
1957
Length
28.3 m (92.8 ft)
Max Span
27.1 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
25,300
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,989,000
Total Project Cost
$2,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.