HWY TREMONT ST over COMB I 90 & AMTRAK

.32 KM S. OF BOST COM S68 · County 025, Massachusetts · Built 1965 · 5 Lanes · 11,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
B160434TFDOTNBI
Year Built
1965
Length
52.1 m (170.9 ft)
Max Span
17.7 m
Width
25.1 m (82.3 ft)
Lanes
5
Daily Traffic
11,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,637,000
Total Project Cost
$12,956,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.