HWY SHAWMUT AVE over COMB AMTRAK/MBTA

OVER ORANGE LINE · County 025, Massachusetts · Built 1932 · 3 Lanes · 8,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B160804V5MUNNBI
Year Built
1932
Reconstructed
1975
Length
17.1 m (56.1 ft)
Max Span
17.1 m
Width
18.9 m (62 ft)
Lanes
3
Daily Traffic
8,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,209,000
Total Project Cost
$3,314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.