ST 28 SB/CLARENDON over COMB I 90 &CSX &ORNG LN

.8 KM S. STORROW DR S64 · County 025, Massachusetts · Built 1965 · 4 Lanes · 16,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B160474TCDOTNBI
Year Built
1965
Length
75.7 m (248.4 ft)
Max Span
21 m
Width
19 m (62.3 ft)
Lanes
4
Daily Traffic
16,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,375,000
Total Project Cost
$14,063,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.