ST 28 SB/CLARENDON over COMB I 90 &CSX &ORNG LN
.8 KM S. STORROW DR S64 · County 025, Massachusetts · Built 1965 · 4 Lanes · 16,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.347858, -71.0738
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 61 years old.
Nearby Bridges
ST 28 NB/COLUMBUS over COMB I 90 &CSX &ORNG LN
Built 1965
HWY DARTMOUTH ST over TR COMM RAIL & OL
Built 1961
HWY DARTMOUTH ST over RR AMTRAK/MBTA
Built 1983
HWY BERKELEY ST over I 90
Built 1965
HWY DARTMOUTH ST over HWY I 90
Built 1965
HWY BERKELEY ST over COMB AMTRAK/MBTA & ORNG
Built 1982
I 90 EB RAMPS OFF over RR MBTA/CSX
Built 1965
I 90 RAMP D over OTHER MBTA & RAMP B
Built 1981
HWY ARLINGTON ST over COMB I 90 & AMTRAK
Built 1965
ST 9 HUNTINGTN AV over COMB I 90 & MBTA/CSX
Built 1965
Bridge Details
- Structure #
- B160474TCDOTNBI
- Year Built
- 1965
- Length
- 75.7 m (248.4 ft)
- Max Span
- 21 m
- Width
- 19 m (62.3 ft)
- Lanes
- 4
- Daily Traffic
- 16,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,375,000
- Total Project Cost
- $14,063,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.