HWY DARTMOUTH ST over RR AMTRAK/MBTA

.16 KM S OF I90/COPLY PL. · County 025, Massachusetts · Built 1983 · 4 Lanes · 27,310 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B160853HNDOT634
Year Built
1983
Length
22.9 m (75.1 ft)
Max Span
22 m
Width
30.4 m (99.7 ft)
Lanes
4
Daily Traffic
27,310
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,900,000
Total Project Cost
$2,851,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.