I 90 RAMP B & D over HWY SERVICE ROAD

EXIT 22 NEAR TOP RP SPLIT · County 025, Massachusetts · Built 1981 · 2 Lanes · 30,517 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B16298B85DOTNBI
Year Built
1981
Length
9.5 m (31.2 ft)
Max Span
9.5 m
Width
19.5 m (64 ft)
Lanes
2
Daily Traffic
30,517
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$2,178,000
Total Project Cost
$3,268,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.