I 90 RAMP D over OTHER RELIEF

I 90 EXIT 22 · County 025, Massachusetts · Built 1981 · 2 Lanes · 19,396 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B16301B8FDOTNBI
Year Built
1981
Length
33.8 m (110.9 ft)
Max Span
17.6 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
19,396
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,616,000
Total Project Cost
$6,925,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.