I 90 RAMP D over OTHER MBTA & RAMP B

EXIT 22 TOWARDS STUART ST · County 025, Massachusetts · Built 1981 · 2 Lanes · 19,396 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B16301B8HDOTNBI
Year Built
1981
Length
47.2 m (154.9 ft)
Max Span
18.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
19,396
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
$6,226,000
Total Project Cost
$9,340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.