HWY DARTMOUTH ST over TR COMM RAIL & OL

SPAN 3-5 BACK BAY STA · County 025, Massachusetts · Built 1961 · 4 Lanes · 8,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B160854V7MBTNBI
Year Built
1961
Reconstructed
1981
Length
94.4 m (309.7 ft)
Max Span
21.9 m
Width
25.1 m (82.3 ft)
Lanes
4
Daily Traffic
8,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$15,481,000
Total Project Cost
$23,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.