ST109 SPRING ST over WATER CHARLES RIVER

@ DEDHAM TL = D05006 · County 025, Massachusetts · Built 1861 · 3 Lanes · 40,200 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B161772KYDOTNBI
Year Built
1861
Reconstructed
2002
Length
38.1 m (125 ft)
Max Span
5.8 m
Width
17.5 m (57.4 ft)
Lanes
3
Daily Traffic
40,200
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,768,000
Total Project Cost
$5,653,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.