HWY BELLEVUE ST over RR MBTA

1.8 KM NE OF JCTSR109&RT1 · County 025, Massachusetts · Built 1936 · 2 Lanes · 3,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B161173HFDOT634
Year Built
1936
Reconstructed
1987
Length
12.2 m (40 ft)
Max Span
11.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,100
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,064,000
Total Project Cost
$1,597,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.