HWY CENTRE ST over RR MBTA

1.6 KM NE JCT SR109&RT1 · County 025, Massachusetts · Built 1888 · 6 Lanes · 23,147 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B161183HHDOT634
Year Built
1888
Reconstructed
1969
Length
15.2 m (49.9 ft)
Max Span
14.6 m
Width
69.3 m (227.4 ft)
Lanes
6
Daily Traffic
23,147
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,199,000
Total Project Cost
$10,799,000