HWY BAKER ST over RR MBTA/CSX

.8 KM NE OF JCT SR109&RT1 · County 025, Massachusetts · Built 1906 · 2 Lanes · 11,121 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B161743HEDOT634
Year Built
1906
Reconstructed
1977
Length
12.3 m (40.4 ft)
Max Span
11.8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
11,121
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,098,000
Total Project Cost
$1,648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.