HWY WASHNGTON ST over WATER MOTHER BROOK

.5 KM. NE OF US 1 · County 021, Massachusetts · Built 1959 · 4 Lanes · 30,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
D05008342DOTNBI
Year Built
1959
Reconstructed
2009
Length
10.1 m (33.1 ft)
Max Span
4.9 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
30,000
Material
Concrete Continuous
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,246,000
Total Project Cost
$1,870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.