HWY CEDAR ST over RR MBTA/CSX

.32 KM NE GREENLODGE ST · County 021, Massachusetts · Built 1961 · 2 Lanes · 14,000 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
D05018374DOT634
Year Built
1961
Length
14.9 m (48.9 ft)
Max Span
13.9 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
14,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,257,000
Total Project Cost
$4,886,000