HWY MILTON ST over RR AMTRAK/MBTA

182 M NW OF WOLCOTT SQ. · County 025, Massachusetts · Built 1919 · 4 Lanes · 42,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B161113H0DOT634
Year Built
1919
Reconstructed
1977
Length
64.1 m (210.3 ft)
Max Span
32.3 m
Width
16.7 m (54.8 ft)
Lanes
4
Daily Traffic
42,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,269,000
Total Project Cost
$25,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.