HWY RESRVATN RD over RR AMTRAK/MBTA
1.2 KM NE OF WOLCOTT SQ. · County 025, Massachusetts · Built 1898 · 2 Lanes · 4,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.247978, -71.129014
This bridge is in worse condition than 55.1% of bridges in County 025. The average bridge in Massachusetts is 0 years old; this one is 128 years old.
Nearby Bridges
HWY RESERVATN RD over WATER MOTHER BROOK
Built 1898
HWY HYDE PARK AV over WATER MOTHER BROOK
Built 1991
HWY DANA AVE over RR MBTA
Built 1908
HWY RIVER ST over WATER MOTHER BROOK
Built 1976
HWY DANA AVE over WATER NEPONSET RIVER
Built 1908
HWY RIVER ST over RR AMTRAK/MBTA
Built 1883
HWY MILTON ST over RR AMTRAK/MBTA
Built 1919
HWY FAIRMONT AVE over COMB WALNUT ST & MBTA
Built 1908
HWY FAIRMOUNT AV over WATER NEPONSET RIVER
Built 1907
HWY TRUMAN HWY over WATER NEPONSET RIVER
Built 1939
Bridge Details
- Structure #
- B161103H7DOT634
- Year Built
- 1898
- Reconstructed
- 1981
- Length
- 65.2 m (213.9 ft)
- Max Span
- 25 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 4,300
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,613,000
- Total Project Cost
- $8,420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.