HWY FAIRMOUNT AV over WATER NEPONSET RIVER

JUST NW OF TRUMAN HWY · County 025, Massachusetts · Built 1907 · 2 Lanes · 16,600 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B16025386MUNNBI
Year Built
1907
Reconstructed
1973
Length
21.6 m (70.9 ft)
Max Span
21.6 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
16,600
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,171,000
Total Project Cost
$3,257,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.