HWY EAST ST over I 95 /US1/ST128
.96 KM SE OF US 1 · County 021, Massachusetts · Built 1956 · 1 Lanes · 22,629 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.223744, -71.172244
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 70 years old.
Nearby Bridges
HWY EAST ST over I 95 /US1/ST128
Built 1956
I 95 NB/US1SB over RR MBTA/CSX
Built 2004
I 95 SB/US1NB over RR MBTA/CSX
Built 2003
HWY EAST ST over US 1 PROVIDENCE HWY
Built 1956
US 1 PROVDNCE HWY over I 95 /ST 128
Built 2009
ST 1 A/WASHINGTON over I 95 SB/ST 128 SB
Built 2010
ST 1 A/WASHINGTON over I 95 NB/ST 128 NB
Built 2010
US 1 PROVDNCE HWY over WATER PURGATORY BROOK
Built 1932
HWY CEDAR ST over RR MBTA/CSX
Built 1961
I 95 /ST128 over HWY UNIVERSITY AVE
Built 2008
Bridge Details
- Structure #
- W3101436CDOTNBI
- Year Built
- 1956
- Reconstructed
- 1984
- Length
- 72.5 m (237.9 ft)
- Max Span
- 23.2 m
- Width
- 16.1 m (52.8 ft)
- Lanes
- 1
- Daily Traffic
- 22,629
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $12,430,000
- Total Project Cost
- $18,646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.