ST 1 A/WASHINGTON over I 95 NB/ST 128 NB
US 1A AT ST 128 · County 021, Massachusetts · Built 2010 · 4 Lanes · 28,448 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.231397, -71.184936
This bridge is in worse condition than 7.6% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 16 years old.
Nearby Bridges
ST 1 A/WASHINGTON over I 95 SB/ST 128 SB
Built 2010
US 1 PROVDNCE HWY over I 95 /ST 128
Built 2009
I 95 SB/US1NB over RR MBTA/CSX
Built 2003
I 95 NB/US1SB over RR MBTA/CSX
Built 2004
HWY EAST ST over US 1 PROVIDENCE HWY
Built 1956
HWY EAST ST over I 95 /US1/ST128
Built 1956
HWY EAST ST over I 95 /US1/ST128
Built 1956
ST109 HIGH ST over I 95 /128 NB
Built 2015
ST109 HIGH ST over I 95 SB/128 SB
Built 2015
HWY PROVDNCE HWY over ST135 HIGH & HARRIS STS
Built 2010
Bridge Details
- Structure #
- D05044B1GDOTNBI
- Year Built
- 2010
- Length
- 35.1 m (115.2 ft)
- Max Span
- 33 m
- Width
- 20.7 m (67.9 ft)
- Lanes
- 4
- Daily Traffic
- 28,448
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,085,000
- Total Project Cost
- $4,628,000