ST109 HIGH ST over I 95 /128 NB
109 AT I-95 NB · County 021, Massachusetts · Built 2015 · 4 Lanes · 29,741 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.244519, -71.201781
This bridge is in worse condition than 7.6% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 11 years old.
Nearby Bridges
ST109 HIGH ST over I 95 SB/128 SB
Built 2015
ST 1 A/WASHINGTON over I 95 NB/ST 128 NB
Built 2010
ST109 BRIDGE ST over WATER CHARLES RIVER
Built 2012
ST 1 A/WASHINGTON over I 95 SB/ST 128 SB
Built 2010
I 95 NB/ST128 NB over ST135 WEST ST
Built 2014
HWY AMES ST over WATER CHARLES RIVER
Built 2012
I 95 SB/ST128SB over ST135 WEST ST
Built 2014
US 1 PROVDNCE HWY over I 95 /ST 128
Built 2009
HWY GREENDALE AV over WATER CHARLES RIVER
Built 1876
I 95 SB/ST128 SB over WATER CHARLES RIVER
Built 2015
Bridge Details
- Structure #
- D05042B1MDOTNBI
- Year Built
- 2015
- Length
- 36 m (118.1 ft)
- Max Span
- 35.4 m
- Width
- 25.9 m (85 ft)
- Lanes
- 4
- Daily Traffic
- 29,741
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $624,000
- Total Project Cost
- $937,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.