I 95 NB/ST128 NB over ST135 WEST ST

I 95 AT ST 135 · County 021, Massachusetts · Built 2014 · 5 Lanes · 70,136 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
D05040B2CDOTNBI
Year Built
2014
Length
16.9 m (55.4 ft)
Max Span
16.9 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
70,136
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$663,000
Total Project Cost
$995,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.