I 95 NB/ST128 NB over ST135 WEST ST
I 95 AT ST 135 · County 021, Massachusetts · Built 2014 · 5 Lanes · 70,136 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.264111, -71.205417
This bridge is in worse condition than 7.6% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 12 years old.
Nearby Bridges
I 95 SB/ST128SB over ST135 WEST ST
Built 2014
HWY GREENDALE AV over WATER CHARLES RIVER
Built 1876
I 95 SB/ST128 SB over WATER CHARLES RIVER
Built 2015
I 95 NB/ST128 NB over WATER CHARLES RIVER
Built 2014
HWY GRT PLN AVE over I 95 /ST 128 NB & SB
Built 2015
ST135 DEDHAM AVE over WATER CHARLES RIVER
Built 1909
HWY GREENDALE AV over RR MBTA
Built 1850
HWY GRT PLN AVE over RR MBTA
Built 1900
ST109 HIGH ST over I 95 /128 NB
Built 2015
ST109 BRIDGE ST over WATER CHARLES RIVER
Built 2012
Bridge Details
- Structure #
- D05040B2CDOTNBI
- Year Built
- 2014
- Length
- 16.9 m (55.4 ft)
- Max Span
- 16.9 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 5
- Daily Traffic
- 70,136
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $663,000
- Total Project Cost
- $995,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.