HWY GREENDALE AV over RR MBTA

NEEDHAM LINE MP 10.39 · County 021, Massachusetts · Built 1850 · 2 Lanes · 6,700 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
N04010376DOT634
Year Built
1850
Reconstructed
1932
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
6,700
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$968,000
Total Project Cost
$1,453,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.