ST135 DEDHAM AVE over WATER CHARLES RIVER

0.48 KM NW OF ST 128 · County 021, Massachusetts · Built 1909 · 2 Lanes · 23,017 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
D05001366DOTNBI
Year Built
1909
Length
17.1 m (56.1 ft)
Max Span
7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
23,017
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,319,000
Total Project Cost
$1,979,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.