HWY CHESTNUT ST over WATER CHARLES RIVER

0.16 KM N OF DEDHAM ST · County 021, Massachusetts · Built 1922 · 2 Lanes · 10,100 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
D10005367DOTNBI
Year Built
1922
Reconstructed
1977
Length
33.8 m (110.9 ft)
Max Span
10.4 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
10,100
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,030,000
Total Project Cost
$9,046,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.