HWY GRT PLN AVE over I 95 /ST 128 NB & SB
AT I 95 · County 021, Massachusetts · Built 2015 · 2 Lanes · 21,900 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.269575, -71.200439
This bridge is in worse condition than 29.2% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 11 years old.
Nearby Bridges
I 95 NB/ST128 NB over WATER CHARLES RIVER
Built 2014
I 95 SB/ST128 SB over WATER CHARLES RIVER
Built 2015
HWY GREENDALE AV over WATER CHARLES RIVER
Built 1876
I 95 NB/ST128 NB over ST135 WEST ST
Built 2014
I 95 SB/ST128SB over ST135 WEST ST
Built 2014
HWY GREENDALE AV over RR MBTA
Built 1850
HWY GRT PLN AVE over RR MBTA
Built 1900
ST135 DEDHAM AVE over WATER CHARLES RIVER
Built 1909
ST109 SPRING ST over WATER CHARLES RIVER
Built 1861
HWY GARDNER ST over RR MBTA
Built 1906
Bridge Details
- Structure #
- N040295W4DOTNBI
- Year Built
- 2015
- Length
- 64.9 m (212.9 ft)
- Max Span
- 31.9 m
- Width
- 15.1 m (49.5 ft)
- Lanes
- 2
- Daily Traffic
- 21,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,216,000
- Total Project Cost
- $1,825,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.