HWY BUSSEY ST over WATER MOTHER BROOK

@ INTERSECTION CURVE ST. · County 021, Massachusetts · Built 1976 · 2 Lanes · 12,400 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
D0501033JMUNNBI
Year Built
1976
Length
14.3 m (46.9 ft)
Max Span
13.9 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
12,400
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$3,466,000
Total Project Cost
$5,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.