HWY CANTERBRY ST over RR AMTRAK/MBTA

2.3 KM NW OFJCTSR28&SR138 · County 025, Massachusetts · Built 1985 · 2 Lanes · 16,034 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
B161073HADOT634
Year Built
1985
Length
21.6 m (70.9 ft)
Max Span
19.8 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
16,034
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,649,000
Total Project Cost
$6,974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.