ST147 SPRINGFLD ST over WATER WESTFIELD RIVER

RTE 147 AT WESTFIELD RIV · County 013, Massachusetts · Built 2021 · 5 Lanes · 22,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
A05002BQVDOTNBI
Year Built
2021
Length
104.1 m (341.5 ft)
Max Span
38 m
Width
26.3 m (86.3 ft)
Lanes
5
Daily Traffic
22,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.