ST 57 WB over ST 75 SUFFIELD ST

MM 43.0 ON ST 57 WB · County 013, Massachusetts · Built 1961 · 2 Lanes · 16,422 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
A0502111TDOTNBI
Year Built
1961
Length
50.3 m (165 ft)
Max Span
28.7 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
16,422
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,868,000
Total Project Cost
$7,303,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.