ST 57 EB over ST159 MAIN ST

MM 44.0 ON ST 57 · County 013, Massachusetts · Built 2002 · 3 Lanes · 13,707 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
A05017AKDDOTNBI
Year Built
2002
Length
51.2 m (168 ft)
Max Span
25.5 m
Width
14.7 m (48.2 ft)
Lanes
3
Daily Traffic
13,707
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,889,000
Total Project Cost
$5,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.