US 5 over HWY ACCESS RD

.09 MI S OF W SPRINGFIELD · County 013, Massachusetts · Built 1953 · 4 Lanes · 20,470 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
A050150WBDOTNBI
Year Built
1953
Length
9.4 m (30.8 ft)
Max Span
8.8 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
20,470
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,604,000
Total Project Cost
$2,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.