ST147 WB/MEM AVE over US 5 RIVERDALE ST

AT JCT US 5 & MEMORIAL AV · County 013, Massachusetts · Built 1953 · 2 Lanes · 10,273 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W2102515DDOTNBI
Year Built
1953
Reconstructed
2015
Length
24.3 m (79.7 ft)
Max Span
23.2 m
Width
19.8 m (65 ft)
Lanes
2
Daily Traffic
10,273
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$322,000
Total Project Cost
$484,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.