I 291 LINE L over HWY MAIN ST
0.1 M W JCT DWIGHT ST · County 013, Massachusetts · Built 1969 · 1 Lanes · 75,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.108564, -72.600042
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 57 years old.
Nearby Bridges
I 291 LINE N over HWY MAIN ST & OTHERS
Built 1969
I 291 LINE K over I 91
Built 1969
I 291 CONN & RMP D over HWY DWIGHT ST
Built 1967
I 291 CONN B & C over HWY DWIGHT ST
Built 1967
I 291 RAMP B over HWY DWIGHT ST
Built 1967
I 291 CONN A over HWY DWIGHT ST
Built 1967
I 91 & RMPS L & M over I 291 & CITY STS
Built 1971
I 291 RAMP B over I 291 CONN A & RMP G
Built 1967
HWY CHESTNUT ST over I 291 CONN A/B/C/D&RMP F
Built 1967
US 20 PLAINFLD ST over I 91
Built 1968
Bridge Details
- Structure #
- S24084116DOTNBI
- Year Built
- 1969
- Length
- 44.7 m (146.7 ft)
- Max Span
- 21.3 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 1
- Daily Traffic
- 75,000
- Material
- Steel
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $801,000
- Total Project Cost
- $1,202,000