I 291 CONN & RMP D over HWY DWIGHT ST
.1 M E JCT MAIN ST · County 013, Massachusetts · Built 1967 · 3 Lanes · 19,310 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.110264, -72.597289
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 59 years old.
Nearby Bridges
I 291 CONN B & C over HWY DWIGHT ST
Built 1967
I 291 RAMP B over HWY DWIGHT ST
Built 1967
I 291 CONN A over HWY DWIGHT ST
Built 1967
I 291 RAMP B over I 291 CONN A & RMP G
Built 1967
HWY CHESTNUT ST over I 291 CONN A/B/C/D&RMP F
Built 1967
I 291 LINE L over HWY MAIN ST
Built 1969
I 291 LINE N over HWY MAIN ST & OTHERS
Built 1969
I 291 LINE K over I 91
Built 1969
I 91 & RMPS L & M over I 291 & CITY STS
Built 1971
I 91 over COMB STS/CSX/GWRR/GARAG
Built 1971
Bridge Details
- Structure #
- S2406411ADOTNBI
- Year Built
- 1967
- Length
- 31.5 m (103.3 ft)
- Max Span
- 30.1 m
- Width
- 22.4 m (73.5 ft)
- Lanes
- 3
- Daily Traffic
- 19,310
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,654,000
- Total Project Cost
- $6,982,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.