HWY CHESTNUT ST over I 291 CONN A/B/C/D&RMP F
MM 0.7 ON I-291 · County 013, Massachusetts · Built 1967 · 4 Lanes · 16,277 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.111078, -72.595047
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 59 years old.
Nearby Bridges
I 291 RAMP B over I 291 CONN A & RMP G
Built 1967
I 291 CONN B & C over HWY DWIGHT ST
Built 1967
I 291 RAMP B over HWY DWIGHT ST
Built 1967
I 291 CONN & RMP D over HWY DWIGHT ST
Built 1967
I 291 CONN A over HWY DWIGHT ST
Built 1967
I 291 LINE L over HWY MAIN ST
Built 1969
I 291 LINE N over HWY MAIN ST & OTHERS
Built 1969
I 291 LINE K over I 91
Built 1969
I 91 & RMPS L & M over I 291 & CITY STS
Built 1971
I 91 over COMB STS/CSX/GWRR/GARAG
Built 1971
Bridge Details
- Structure #
- S2406613HDOTNBI
- Year Built
- 1967
- Length
- 99.7 m (327.1 ft)
- Max Span
- 38.1 m
- Width
- 28.3 m (92.8 ft)
- Lanes
- 4
- Daily Traffic
- 16,277
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $18,373,000
- Total Project Cost
- $27,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.