US 20 PLAINFLD ST over I 91

JCT OF I-91 & US 20A · County 013, Massachusetts · Built 1968 · 4 Lanes · 31,251 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S2408710MDOTNBI
Year Built
1968
Length
117.5 m (385.5 ft)
Max Span
32.7 m
Width
25.1 m (82.3 ft)
Lanes
4
Daily Traffic
31,251
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,229,000
Total Project Cost
$28,844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.