US 20 PARK AVE over WATER CONNECTICUT RIVER

NORTH END BRIDGE · County 013, Massachusetts · Built 1924 · 4 Lanes · 27,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S240030UJDOTNBI
Year Built
1924
Reconstructed
1984
Length
361.3 m (1185.4 ft)
Max Span
50.2 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
27,500
Material
Steel
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$50,058,000
Total Project Cost
$75,088,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.